| Project Name | Zhejiang Feite Steel Structure Co., Ltd | Project Introduction | 1. 1 P3 module, screen points 6848 * 2176 2, 1 P2.5 module, screen points 8576 * 3200 |
|---|---|---|---|
| Project Date | 2022.09 | Equipment used | KS9800*2、、、ES4*24、、、G612F*547 |
| Project Location | Hangzhou, Zhejiang Province | Project Requirements | 1. The panel can control the LCD screen and one LCD TV material to play, and the sound can be played independently. 2. The panel can control the equipment, lighting, air conditioner, switch and sound in the exhibition hall. 3. Use the F1Pro server to pl |
View all cases
-
Wuhan Jingkai Investment Co., Ltd. headquarters exhibition hall
Project Name:Wuhan Jingkai Investment Co., Ltd. headquarters exhibition hall
Project Date:2022.05
Project Location:Wuhan City, Hubei Province
Project Introduction:A concave main screen on the front
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Heilongjiang Heihe huma TV studio
Project Name:Heilongjiang Heihe huma TV studio
Project Date:2021.03
Project Location:Heilongjiang
Project Introduction:One main screen on the front and one ear screen on both sides.
-
The fourth people's hospital of guizhou
Project Name:The fourth people's hospital of guizhou
Project Date:2020.01
Project Location:Guizhou
Project Introduction:P2.5,,,3200x1152
-
An exhibition hall in mumbai, India
Project Name:An exhibition hall in mumbai, India
Project Date:2020.01
Project Location:Mumbai, India
Project Introduction:11 LCD screens are irregularly spliced
-
Xi 'an national digital publishing house
Project Name:Xi 'an national digital publishing house
Project Date:2018.11
Project Location:Xi 'an
Project Introduction:The home screen2816*512
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Autumn harvest uprising immersive experience center
Project Name:Autumn harvest uprising immersive experience center
Project Date:2020.01
Project Location:Tonggu
Project Introduction:P2.5
-
The western gold
Project Name:The western gold
Project Date:2020.01
Project Location:Urumqi, xinjiang
Project Introduction:2688x1152,,,P2.5