| Project Name | Jiangsu century edge wedding Art Center | Project Introduction | P2. 5 ordinary brush, 35 long, 43 high, screen resolution 4480 * 2240, semicircular |
|---|---|---|---|
| Project Date | 2020.03 | Equipment used | KLS24,,,G612C*131 |
| Project Location | Jiangsu | Project Requirements | 1. The screen of the project is semicircular, and the transmitted image is required to be clear without frame loss and flicker. 2. The camera has no scanning line, and the overall equipment is stable, which perfectly meets the project needs of the user. |
View all cases
-
Guizhou liuzhi project
Project Name:Guizhou liuzhi project
Project Date:2019.12
Project Location:Guizhou
Project Introduction:P4 arch screen, each arch is 128 points wide and 3286 points long, forming an arch tunnel.
-
Zhejiang Shengqi technology exhibition hall Co., Ltd
Project Name:Zhejiang Shengqi technology exhibition hall Co., Ltd
Project Date:2021.08
Project Location:Hangzhou City, Zhejiang Province
Project Introduction:Four displays of different sizes
-
Guizhou Geological Museum
Project Name:Guizhou Geological Museum
Project Date:2022.06
Project Location:Guiyang City, Guizhou Province
Project Introduction:There are three screens, a tunnel screen, a three fold screen on the wall and a conventional screen, all of which are P2 modules.
-
Baotou City Planning Exhibition Hall
Project Name:Baotou City Planning Exhibition Hall
Project Date:2021.12
Project Location:Inner Mongolia
Project Introduction:Separate scene, inner arc projection fusion
-
Shanghai Baoshan hotel lobby
Project Name:Shanghai Baoshan hotel lobby
Project Date:2021.08
Project Location:Baoshan District, Shanghai
Project Introduction:Thirty four rhombic screens are arranged in two rows, one with 17 rhombic screens
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ? 4352,,,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Exhibition hall of bonded port area
Project Name:Exhibition hall of bonded port area
Project Date:2020.12
Project Location:Ningbo City, Zhejiang Province
Project Introduction:1. Ultra long screen approximate point-to-point display; 2. One slide control screen; 3.. Unified broadcast control of multi screen display.
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.